Home / News / Company News

Hot News

Huayang River flood storage and detention area construction project

Mar 11,2026

by:Jiangsu Lafaelt Electric Co., Ltd.

Follow Us:

Our LETB series high-voltage capacitor banks have been successfully applied in the Huayang River flood storage and detention area construction project. Through precise reactive power compensation, they improve the system's power factor, stabilize voltage, and reduce losses, contributing to the construction of the national water network. In the future, we will continue to focus on the field of power quality, providing reliable power guarantees for more national key projects!

 

 

 


0

Let s talk! We’ll provide the perfect solution for you!

Lafaelt Electric is focusing on complete solutions for power quality and energy management. We have excellent quality in designing, researching, producing and manufacturing on Active harmonic filter, Static VAR generator(SVG), Power capacitor, Reactor, Thyristor switch, Dynamic voltage restorer and Active voltage conditioner.

Copyright © 2022 Jiangsu Lafaelt Electric Co., Ltd.            Privacy Policy Powered by Bontop